Reroping Series

Details the major procedures involved in reroping work. Covers inspecting ropes for defects, which includes wire rope inspection criteria, an explanation of rouging, a look at rope diameter, the process of ordering replacement ropes, and setting up the job with the customer. Addresses reroping configurations and rope replacement, including preparation for reroping, work site setup, tools and rigging equipment, car and counterweight setup and reroping procedures for 1:1 and 2:1 rope routing. Discusses socketing and shackling, which involves rope re-socketing, Babbitting and wedge clamps, rope length adjustments, rope tension adjustments, rope ID tags and the effects on load weighing.